Find the stronger projectsin your portfolio.
Compare commercial and industrial sites consistently. Identify which battery, solar, and generator opportunities warrant deeper work.
For early-stage project qualification. Not a final engineering study or investment recommendation.
The portfolio question is not “Which site has the largest electric bill?” It is “Where do the available value, technical feasibility and investment readiness combine into the strongest development opportunity?”
Turn a long site list into a focused project pipeline
Consistent screening helps focus engineering and capital on the highest-potential locations.
Import multiple sites
Use a repeatable template to organize basic project information across locations.
Compare potential value
Review project opportunities using a consistent analytical framework.
Prioritize next steps
Narrow the pipeline and determine where technical diligence belongs.
Conceptual depiction. Actual investment attractiveness requires site- and market-specific analysis.
From scattered opportunities to disciplined screening
A multi-site perspective can reveal where the business case is strongest and where further work is unlikely to pay off.
A useful portfolio funnel has more than one ranking metric
An energy consultant or developer may manage sites with very different utility tariffs, building loads, states and available technologies. Comparing energy bills alone can hide attractive projects while overvaluing sites with high spend but limited feasible savings.
Economic headroom
Rate design, demand exposure, consumption, site load pattern and capital cost influence the potential investment case.
Value access
Market participation, eligible utility programs, incentive conditions and available revenue channels vary by location.
Site readiness
Space, ownership, roof quality, site access, interconnection, operating restrictions and project complexity affect feasibility.
Investment priority
Compare estimated net value, uncertainty, development effort and the owner’s timeline before committing sales or engineering resources.
A portfolio view that reveals why sites differ
This illustrative decision board shows the factors an advisor would need to compare and the types of next actions that follow.
What a decision maker needs to see
For each site, a useful screening dashboard should summarize the plausible DER pathway, key value drivers, material assumptions, missing inputs and recommended diligence. Advisors can then decide which customers to approach, which development resources to commit and which options to defer.
Without that explanation, a raw ranking table can be misleading. A site may have attractive theoretical market value but face interconnection, eligibility or ownership constraints that prevent monetization.
- Advance High-confidence value with manageable diligence needs.
- Investigate Promising economics but critical data or eligibility missing.
- Hold Low value or material development constraints under current assumptions.
Turn a site list into a next-action list
These fictional sites demonstrate workflow categories, not calculated scores, customer results or a DECH product screenshot.
Showing 4 illustrative sites.
Battery candidate
Repeated short peaks; confirm the billed demand interval.
InvestigateSolar + storage candidate
Basic site access and data assembled; proceed to detailed review.
AdvanceGeneration / hybrid candidate
Critical-load need identified; confirm fuel, permits and controls.
InvestigateSite access unresolved
Landlord rights are not established; resolve before development.
HoldAdvance means ready for the next review stage, not ready for investment. The examples are intentionally qualitative: economics, evidence quality and development readiness need separate consideration.
How one consulting firm built a more focused investment funnel
DECH describes working with a national energy consulting and infrastructure-development firm to screen commercial and industrial DER opportunities with a consistent analytical framework.
The engagement assessed system sizing relative to installed cost, avoided grid energy and avoided demand. By applying the same framework across multiple customer sites, the firm could compare opportunities instead of starting from scratch for each location.
The practical outcome was a more focused development pipeline. Projects with more credible sources of value could receive sales, engineering and investment attention earlier, while others could be postponed before substantial pre-engineering work.
The case demonstrates where a shared analytical framework supports a practical project-selection workflow.
Read the multi-site DECH case study
See the original problem, analytical framework and investment decision reported on DECH’s case-study page.
Good portfolio screening helps you decide where to invest attention before deciding where to invest capital.
Editorial summary based on the DECH multi-site investment-screening caseReference: DECH multi-site investment-screening case study.
What it takes to maintain a credible multi-site pipeline
Scaling the number of analyzed locations can improve efficiency only when site data and assumptions are handled consistently.
Use a standardized data template, clear units, site identifiers and documented assumptions. Flag missing tariff, usage and project-cost inputs rather than filling them with unjustified precision.
A strong modeled return does not erase landlord consent, interconnection constraints, safety and zoning requirements, or changes to customer ownership and operations.
Keep battery, solar and generator configurations consistent enough for comparison. Maintain separate economic cases when equipment sizes or customer objectives differ materially.
Tariffs, incentive availability, market participation rules and installed costs evolve. The shortlist should be revisited before material procurement or investment commitments.
Questions buyers ask before taking the next step
Actual economics, operating constraints and program eligibility require site-level review.
How should we rank dozens of C&I sites for battery projects?
Start with consistent load and tariff data, candidate technology configurations and applicable value pathways. Then compare net economics alongside development constraints and data confidence, not just gross bill savings.
Can multi-site screening support solar and generators too?
Yes. DECH describes multi-technology analysis; each pathway should be evaluated using appropriate technical inputs, emissions, resilience and financial assumptions.
How many sites can DECH analyze at once?
DECH’s public FAQ currently describes up to 25 sites per data-template upload and indicates that broader usage depends on the subscription. Verify plan terms before relying on a particular limit.
Should portfolio results replace project-level engineering?
No. They should prioritize which sites move to site visits, technical design, interconnection review, commercial negotiation and final investment approval.
Put your next site decision in portfolio context.
Explore a consistent way to compare opportunities, document assumptions and focus your development effort.