Multi-Site DER Investment Screening

Find the stronger projectsin your portfolio.

Compare commercial and industrial sites consistently. Identify which battery, solar, and generator opportunities warrant deeper work.

For early-stage project qualification. Not a final engineering study or investment recommendation.

A more focused project pipeline
Several facilities feed a common portfolio screening frameworkONE FRAMEWORKMany opportunitiesPrioritize the next decision
Consistent inputsVisible tradeoffsClear priorities
Illustrative decision framework. Not live data, measured savings or a DECH application screenshot.
THE MAIN IDEA

The portfolio question is not “Which site has the largest electric bill?” It is “Where do the available value, technical feasibility and investment readiness combine into the strongest development opportunity?”

Portfolio opportunity

Turn a long site list into a focused project pipeline

Consistent screening helps focus engineering and capital on the highest-potential locations.

Import multiple sites

Use a repeatable template to organize basic project information across locations.

Compare potential value

Review project opportunities using a consistent analytical framework.

Prioritize next steps

Narrow the pipeline and determine where technical diligence belongs.

Portfolio comparison
Opportunity drivers by site
Illustrative
Northeast A
Mid-Atlantic B
Texas C
Midwest D
Cost savingsMarket potentialOther value

Conceptual depiction. Actual investment attractiveness requires site- and market-specific analysis.

For energy consultants & developers

From scattered opportunities to disciplined screening

A multi-site perspective can reveal where the business case is strongest and where further work is unlikely to pay off.

✓
Compare apples to applesUse common assumptions and similar evaluation criteria.
✓
Focus sales and engineeringLead with projects that show stronger preliminary economics.
✓
Improve investment conversationsMake prioritization transparent across facilities and stakeholders.
Explore the multi-site workflow ↗
Turn scattered leads into a repeatable process

A useful portfolio funnel has more than one ranking metric

An energy consultant or developer may manage sites with very different utility tariffs, building loads, states and available technologies. Comparing energy bills alone can hide attractive projects while overvaluing sites with high spend but limited feasible savings.

01

Economic headroom

Rate design, demand exposure, consumption, site load pattern and capital cost influence the potential investment case.

02

Value access

Market participation, eligible utility programs, incentive conditions and available revenue channels vary by location.

03

Site readiness

Space, ownership, roof quality, site access, interconnection, operating restrictions and project complexity affect feasibility.

04

Investment priority

Compare estimated net value, uncertainty, development effort and the owner’s timeline before committing sales or engineering resources.

Make the shortlist easy to understand

A portfolio view that reveals why sites differ

This illustrative decision board shows the factors an advisor would need to compare and the types of next actions that follow.

Illustrative decision board, not project scores
Site AHigh demand spikes • battery screening candidate • validate tariff
Site BLarge daytime load • solar/solar+storage candidate • review roof & export terms
Site CCritical backup requirement • generation/hybrid candidate • define critical load
Site DLimited site rights • development constraint • resolve access first
The objective is a defensible queue for follow-up, not a false precision ranking based on generic scores.

What a decision maker needs to see

For each site, a useful screening dashboard should summarize the plausible DER pathway, key value drivers, material assumptions, missing inputs and recommended diligence. Advisors can then decide which customers to approach, which development resources to commit and which options to defer.

Without that explanation, a raw ranking table can be misleading. A site may have attractive theoretical market value but face interconnection, eligibility or ownership constraints that prevent monetization.

  • Advance High-confidence value with manageable diligence needs.
  • Investigate Promising economics but critical data or eligibility missing.
  • Hold Low value or material development constraints under current assumptions.

Turn a site list into a next-action list

These fictional sites demonstrate workflow categories, not calculated scores, customer results or a DECH product screenshot.

Showing 4 illustrative sites.

Site A

Battery candidate

Repeated short peaks; confirm the billed demand interval.

Investigate
Site B

Solar + storage candidate

Basic site access and data assembled; proceed to detailed review.

Advance
Site C

Generation / hybrid candidate

Critical-load need identified; confirm fuel, permits and controls.

Investigate
Site D

Site access unresolved

Landlord rights are not established; resolve before development.

Hold

Advance means ready for the next review stage, not ready for investment. The examples are intentionally qualitative: economics, evidence quality and development readiness need separate consideration.

Existing DECH example

How one consulting firm built a more focused investment funnel

DECH describes working with a national energy consulting and infrastructure-development firm to screen commercial and industrial DER opportunities with a consistent analytical framework.

The engagement assessed system sizing relative to installed cost, avoided grid energy and avoided demand. By applying the same framework across multiple customer sites, the firm could compare opportunities instead of starting from scratch for each location.

The practical outcome was a more focused development pipeline. Projects with more credible sources of value could receive sales, engineering and investment attention earlier, while others could be postponed before substantial pre-engineering work.

The case demonstrates where a shared analytical framework supports a practical project-selection workflow.

Read the multi-site DECH case study

See the original problem, analytical framework and investment decision reported on DECH’s case-study page.

View this case study ↗

Good portfolio screening helps you decide where to invest attention before deciding where to invest capital.

Editorial summary based on the DECH multi-site investment-screening case
Comparable inputsPrioritized pipelineDecision rationale

Reference: DECH multi-site investment-screening case study.

From a spreadsheet to a strategy

What it takes to maintain a credible multi-site pipeline

Scaling the number of analyzed locations can improve efficiency only when site data and assumptions are handled consistently.

Normalize the inputs

Use a standardized data template, clear units, site identifiers and documented assumptions. Flag missing tariff, usage and project-cost inputs rather than filling them with unjustified precision.

Separate screening from development readiness

A strong modeled return does not erase landlord consent, interconnection constraints, safety and zoning requirements, or changes to customer ownership and operations.

Record scenario definitions

Keep battery, solar and generator configurations consistent enough for comparison. Maintain separate economic cases when equipment sizes or customer objectives differ materially.

Refresh what changes

Tariffs, incentive availability, market participation rules and installed costs evolve. The shortlist should be revisited before material procurement or investment commitments.

DECH’s published FAQ describes a multi-site upload workflow and a 25-site limit per upload, with overall usage governed by the subscription plan. Confirm current plan limits with DECH before a portfolio rollout.
Frequently asked questions

Questions buyers ask before taking the next step

Actual economics, operating constraints and program eligibility require site-level review.

How should we rank dozens of C&I sites for battery projects?

Start with consistent load and tariff data, candidate technology configurations and applicable value pathways. Then compare net economics alongside development constraints and data confidence, not just gross bill savings.

Can multi-site screening support solar and generators too?

Yes. DECH describes multi-technology analysis; each pathway should be evaluated using appropriate technical inputs, emissions, resilience and financial assumptions.

How many sites can DECH analyze at once?

DECH’s public FAQ currently describes up to 25 sites per data-template upload and indicates that broader usage depends on the subscription. Verify plan terms before relying on a particular limit.

Should portfolio results replace project-level engineering?

No. They should prioritize which sites move to site visits, technical design, interconnection review, commercial negotiation and final investment approval.

From insight to a better next step

Put your next site decision in portfolio context.

Explore a consistent way to compare opportunities, document assumptions and focus your development effort.