Know which DER projectsdeserve a closer look.
Screen battery, solar, and generator opportunities using location-specific economics and a broader view of value before major development spending.
For early-stage project qualification. Not a final engineering study or investment recommendation.
DER project screening is the decision stage between an interesting site and an expensive engineering assignment. Consistent assumptions and site-specific value drivers make the shortlist more defensible.
Know which projects merit deeper engineering
Answer the first investment questions with structured data and consistent comparisons.
Site-specific inputs
Consider location, utility rates, energy use, project configuration and assumptions.
Connected value drivers
Examine cost avoidance, relevant incentives, potential market revenue and reliability value.
Clearer go / no-go decisions
Prioritize the opportunities most deserving of engineering, diligence and capital.
From initial idea to investment shortlist
DECH is designed to help advisors, developers, and energy buyers qualify projects, rather than replace final engineering or bankable diligence.
Qualify the opportunity
Gather basic site and project inputs.
Evaluate the drivers
Review energy, demand, market and resilience factors.
Determine next steps
Advance only the opportunities worthy of deeper analysis.
From a promising lead to a qualified DER opportunity
Project-screening software should answer where an opportunity might exist, which technology pathways deserve attention and which uncertainties must be resolved before the next stage.
Define the objective
Choose the customer’s priority: cost reduction, new revenue, reliability, emissions or a balanced outcome.
Describe the site
Use location, utility context, annual usage, tariff indicators and other available facility inputs.
Evaluate possible DERs
Compare relevant solar, battery, engine/generator and hybrid configurations against the available value stack.
Make a screening decision
Advance, refine or set aside the opportunity. Record the assumptions and diligence needed for the next gate.
Reference: DECH platform capabilities and qualification limits.
Better inputs produce better screening decisions
The most useful feasibility outputs are interpretable: decision-makers should understand what drives modeled value, what has been assumed and what cannot yet be known.
Site and market information
Relevant inputs include facility location, utility territory, energy usage, estimated load shape, tariff, potential technology size, installed cost, incentive context, and the energy market in which the asset would operate.
Financial, operational and environmental outputs
Meaningful screening can examine energy and demand cost avoidance, potential program or market revenue, financial-return indicators, reliability/resilience considerations and emissions-related effects. The important point is consistency across scenarios.
DECH’s public site describes its platform as combining utility rates, energy markets, incentives and technology inputs for rapid project qualification. It also explicitly differentiates qualification from bankable investment analysis.
Opportunity-screening decision memo
This is a proposed presentation format, not a screenshot of a live DECH product feature.
Explore the screening workflow
An educational process navigator, not a live platform interface. Select a stage to see the questions and evidence it should address.
Describe the opportunity and the unknowns.
Record the site location, utility, tariff, energy use, business objective and candidate technologies. Flag missing information rather than replacing it with false precision.
Required context
What must the project accomplish, and who decides whether it advances?
Useful evidence
Recent bills, available interval data, operating hours and known site constraints.
Next output
A consistent starting case with documented assumptions and gaps.
Connect the site to plausible sources of value.
Evaluate relevant bill savings, market pathways and resilience objectives alongside installed and ongoing costs. Do not treat every possible program as an available revenue stream.
Customer savings
Which tariff components change under the proposed operating strategy?
Participation
Which programs can this customer and asset actually access?
Sensitivity
What happens when costs increase or the strongest value stream is unavailable?
Advance, refine or pause the opportunity.
A useful screen should explain why a project deserves further work and what evidence is needed next. A favorable preliminary result is not permission to purchase equipment.
Advance
Proceed to the relevant engineering, interconnection and commercial diligence.
Refine
Improve the data or compare another technology size and operating strategy.
Pause
Resolve a blocking constraint or revisit the opportunity when assumptions change.
Screening, modeling and engineering answer different questions
An early-stage qualification tool should help identify promising sites; it should not be presented as a substitute for design or an investment guarantee.
| Stage | Question to answer | Appropriate evidence | Likely next action |
|---|---|---|---|
| Free exploration | Could economics be interesting? | Simple bill, ZIP, directional assumptions and what-if scenarios | Investigate promising signals |
| Site-specific screening | Which configurations merit deeper work? | Tariff, market, costs, available value, sensitivity, comparative outputs | Shortlist credible candidates |
| Detailed technical diligence | Can the project be engineered and connected? | Electrical design, dispatch details, interconnection, safety and permits | Refine procurement and scope |
| Investment-grade review | Should capital be committed? | Validated engineering, contracts, financing, downside cases and legal/tax review | Approve, revise or reject |
What makes DER analytics useful in actual workflows
Software selection should consider the quality of the investment decision, not just how polished an output dashboard looks.
A repeatable methodology
Use comparable assumptions across opportunities so a portfolio decision does not change according to who built each spreadsheet.
Market and tariff context
Account for location-specific demand, utility rates, incentives and eligibility, rather than applying national averages.
Explainable recommendations
Make the principal value drivers and limitations visible so a consultant can discuss the result credibly with a client.
See DECH applied to an energy advisory workflow
A regional energy advisor used DECH to build a repeatable way to qualify customer opportunities and determine which sites warranted deeper diligence.
Questions buyers ask before taking the next step
Actual economics, operating constraints and program eligibility require site-level review.
What is distributed energy project screening software?
It is a decision-support tool for evaluating potential on-site energy options using location, customer demand, applicable market rules and project-cost assumptions, before committing to substantial engineering or capital expenditure.
Can DECH analyze more than battery projects?
Yes. DECH describes site-specific analytics for batteries, solar and generators, including the impact on financial returns, emissions and reliability. Feature availability depends on the platform and project pathway.
Do I need interval meter data to begin screening?
Not necessarily for an initial directional screen. More detailed interval data can improve the analysis of load peaks, dispatch, energy shifting and tariff impacts.
Is a feasibility screen the same as a final engineering study?
No. It helps decide which opportunities deserve detailed study. Interconnection, engineering design, finance, procurement, permit and operational studies may still be needed.
Focus deeper work on the right opportunities.
See how site-specific qualification can support better project conversations and more disciplined development decisions.