DER Project Feasibility Software

Know which DER projectsdeserve a closer look.

Screen battery, solar, and generator opportunities using location-specific economics and a broader view of value before major development spending.

For early-stage project qualification. Not a final engineering study or investment recommendation.

A clearer qualification pathway
Screening moves from site inputs through value analysis to a qualified next stepSite inputsVALUE DRIVERSCostsMarketsReliabilityNext stepAdvance. Refine. Investigate.Qualification before major development spending
Site inputsValue driversNext steps
Illustrative decision framework. Not live data, measured savings or a DECH application screenshot.
THE MAIN IDEA

DER project screening is the decision stage between an interesting site and an expensive engineering assignment. Consistent assumptions and site-specific value drivers make the shortlist more defensible.

The screening problem

Know which projects merit deeper engineering

Answer the first investment questions with structured data and consistent comparisons.

Site-specific inputs

Consider location, utility rates, energy use, project configuration and assumptions.

Connected value drivers

Examine cost avoidance, relevant incentives, potential market revenue and reliability value.

Clearer go / no-go decisions

Prioritize the opportunities most deserving of engineering, diligence and capital.

Built for project qualification

From initial idea to investment shortlist

DECH is designed to help advisors, developers, and energy buyers qualify projects, rather than replace final engineering or bankable diligence.

✓
Screen one site or manyBuild a repeatable framework for comparing projects.
✓
Model across multiple technologiesAssess batteries, solar, generators, and hybrid configurations.
✓
See more than bill savingsInclude applicable economic, market, emissions and resilience considerations.
See the platform approach ↗
ANALYSIS → DECISION
1

Qualify the opportunity

Gather basic site and project inputs.

2

Evaluate the drivers

Review energy, demand, market and resilience factors.

3

Determine next steps

Advance only the opportunities worthy of deeper analysis.

Designed for qualification, not a final investment decision.
A process designed around investment decisions

From a promising lead to a qualified DER opportunity

Project-screening software should answer where an opportunity might exist, which technology pathways deserve attention and which uncertainties must be resolved before the next stage.

STEP 01

Define the objective

Choose the customer’s priority: cost reduction, new revenue, reliability, emissions or a balanced outcome.

STEP 02

Describe the site

Use location, utility context, annual usage, tariff indicators and other available facility inputs.

STEP 03

Evaluate possible DERs

Compare relevant solar, battery, engine/generator and hybrid configurations against the available value stack.

STEP 04

Make a screening decision

Advance, refine or set aside the opportunity. Record the assumptions and diligence needed for the next gate.

Reference: DECH platform capabilities and qualification limits.

What should a first-pass model consider?

Better inputs produce better screening decisions

The most useful feasibility outputs are interpretable: decision-makers should understand what drives modeled value, what has been assumed and what cannot yet be known.

Site and market information

Relevant inputs include facility location, utility territory, energy usage, estimated load shape, tariff, potential technology size, installed cost, incentive context, and the energy market in which the asset would operate.

Financial, operational and environmental outputs

Meaningful screening can examine energy and demand cost avoidance, potential program or market revenue, financial-return indicators, reliability/resilience considerations and emissions-related effects. The important point is consistency across scenarios.

DECH’s public site describes its platform as combining utility rates, energy markets, incentives and technology inputs for rapid project qualification. It also explicitly differentiates qualification from bankable investment analysis.

Decision framework

Opportunity-screening decision memo

Site & marketLocation, utility tariff, program pathways
TechnologySolar, battery, generation or hybrid options
ValueBill savings, realizable revenue, reliability
EconomicsCapital costs, assumptions, sensitivities
DecisionAdvance, refine, or pause for missing data

This is a proposed presentation format, not a screenshot of a live DECH product feature.

Explore the screening workflow

An educational process navigator, not a live platform interface. Select a stage to see the questions and evidence it should address.

Describe the opportunity and the unknowns.

Record the site location, utility, tariff, energy use, business objective and candidate technologies. Flag missing information rather than replacing it with false precision.

Required context

What must the project accomplish, and who decides whether it advances?

Useful evidence

Recent bills, available interval data, operating hours and known site constraints.

Next output

A consistent starting case with documented assumptions and gaps.

Connect the site to plausible sources of value.

Evaluate relevant bill savings, market pathways and resilience objectives alongside installed and ongoing costs. Do not treat every possible program as an available revenue stream.

Customer savings

Which tariff components change under the proposed operating strategy?

Participation

Which programs can this customer and asset actually access?

Sensitivity

What happens when costs increase or the strongest value stream is unavailable?

Advance, refine or pause the opportunity.

A useful screen should explain why a project deserves further work and what evidence is needed next. A favorable preliminary result is not permission to purchase equipment.

Advance

Proceed to the relevant engineering, interconnection and commercial diligence.

Refine

Improve the data or compare another technology size and operating strategy.

Pause

Resolve a blocking constraint or revisit the opportunity when assumptions change.

Choosing the right depth of analysis

Screening, modeling and engineering answer different questions

An early-stage qualification tool should help identify promising sites; it should not be presented as a substitute for design or an investment guarantee.

StageQuestion to answerAppropriate evidenceLikely next action
Free explorationCould economics be interesting?Simple bill, ZIP, directional assumptions and what-if scenariosInvestigate promising signals
Site-specific screeningWhich configurations merit deeper work?Tariff, market, costs, available value, sensitivity, comparative outputsShortlist credible candidates
Detailed technical diligenceCan the project be engineered and connected?Electrical design, dispatch details, interconnection, safety and permitsRefine procurement and scope
Investment-grade reviewShould capital be committed?Validated engineering, contracts, financing, downside cases and legal/tax reviewApprove, revise or reject
DECH is positioned toward earlier qualification and screening; technical, commercial and bankable analysis can follow when the case merits it.
For energy advisors, developers and C&I teams

What makes DER analytics useful in actual workflows

Software selection should consider the quality of the investment decision, not just how polished an output dashboard looks.

01

A repeatable methodology

Use comparable assumptions across opportunities so a portfolio decision does not change according to who built each spreadsheet.

02

Market and tariff context

Account for location-specific demand, utility rates, incentives and eligibility, rather than applying national averages.

03

Explainable recommendations

Make the principal value drivers and limitations visible so a consultant can discuss the result credibly with a client.

See DECH applied to an energy advisory workflow

A regional energy advisor used DECH to build a repeatable way to qualify customer opportunities and determine which sites warranted deeper diligence.

View DECH case studies ↗
Frequently asked questions

Questions buyers ask before taking the next step

Actual economics, operating constraints and program eligibility require site-level review.

What is distributed energy project screening software?

It is a decision-support tool for evaluating potential on-site energy options using location, customer demand, applicable market rules and project-cost assumptions, before committing to substantial engineering or capital expenditure.

Can DECH analyze more than battery projects?

Yes. DECH describes site-specific analytics for batteries, solar and generators, including the impact on financial returns, emissions and reliability. Feature availability depends on the platform and project pathway.

Do I need interval meter data to begin screening?

Not necessarily for an initial directional screen. More detailed interval data can improve the analysis of load peaks, dispatch, energy shifting and tariff impacts.

Is a feasibility screen the same as a final engineering study?

No. It helps decide which opportunities deserve detailed study. Interconnection, engineering design, finance, procurement, permit and operational studies may still be needed.

From insight to a better next step

Focus deeper work on the right opportunities.

See how site-specific qualification can support better project conversations and more disciplined development decisions.